A new dual injection system for AMS facility | |
L. Liu; W. J. Zhou; P. Cheng; H. G. Yu; M. B. Chen | |
2007 | |
发表期刊 | Nuclear Instruments & Methods in Physics Research Section B-Beam Interactions with Materials and Atoms |
卷号 | 259期号:1页码:208-212 |
部门归属 | IEECAS SKLLQG |
项目资助者 | IEECAS SKLLQG ; IEECAS SKLLQG |
文献类型 | 期刊论文 |
条目标识符 | http://ir.ieecas.cn/handle/361006/742 |
专题 | 黄土与第四纪地质国家重点实验室(2005-2009) |
推荐引用方式 GB/T 7714 | L. Liu,W. J. Zhou,P. Cheng,et al. A new dual injection system for AMS facility[J]. Nuclear Instruments & Methods in Physics Research Section B-Beam Interactions with Materials and Atoms,2007,259(1):208-212. |
APA | L. Liu,W. J. Zhou,P. Cheng,H. G. Yu,&M. B. Chen.(2007).A new dual injection system for AMS facility.Nuclear Instruments & Methods in Physics Research Section B-Beam Interactions with Materials and Atoms,259(1),208-212. |
MLA | L. Liu,et al."A new dual injection system for AMS facility".Nuclear Instruments & Methods in Physics Research Section B-Beam Interactions with Materials and Atoms 259.1(2007):208-212. |
条目包含的文件 | ||||||
文件名称/大小 | 文献类型 | 版本类型 | 开放类型 | 使用许可 | ||
LiuLin07.pdf(202KB) | 开放获取 | -- | 请求全文 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论